Contents
Updated May 2024: Here are three steps to using a repair tool to fix exe problems on your computer: Get it at this link
- Download and install this software.
- Scan your computer for exe problems.
- Repair the exe errors with software tool
What is uninstall.exe?
uninstall.exe is an executable file from ConstructionSkills Risk Assessment & Method Statement Manager, typically around 10.86 MB. While the .exe extension indicates an executable file, it's crucial to determine if this specific file is a safe part of the Windows operating system, a legitimate application, or a harmful virus or trojan.
Recommended: Identify uninstall.exe related errors
(optional offer for Fortect)
Is uninstall.exe safe, or is it a virus or malware?
To determine if uninstall.exe is legitimate or a virus:
- Check its location: Legitimate uninstall.exe should be in
- Use Task Manager: Add "Image Path Name" in columns to see file locations.
- Use Microsoft's Process Explorer: Check "Verified Signer" status for each process. If it says "Unable to Verify," further investigation is needed. Not all legitimate processes have a verified signature, but no bad processes do.
The most important facts about uninstall.exe:
- Located in C:\Program Files\constructionskills subfolder;
- Publisher: ConstructionSkills
- Full Path:
- Help file:
- Publisher URL: www.cskills.org
- Uninstaller: C:\Program Files\ConstructionSkills\uninstall.exe
- Language:
- MD5 Hash:
- % of Users that remove it: 7%
- User Rating: Excellent
- Known to be up to 10.86 MB in size.
If you're experiencing issues with uninstall.exe, verify its trustworthiness by checking its location and size in Task Manager (should be in C:\Program Files\constructionskills). If you suspect a virus, use a security application like Malwarebytes to remove it.
Not all tools detect every malware, so multiple attempts might be necessary. If the virus hinders the removal, boot into Safe Mode with Networking for a more secure environment, allowing you to run a security scan and thoroughly analyze your system.
Can I remove or delete uninstall.exe?
7% of people remove this file, so it may be harmless.
Do not delete a safe executable file as it might affect associated programs. Always keep your software updated to avoid issues with corrupted files. Regularly check for driver and software updates.
To confirm the safety of suspicious files, use a system analysis tool like Fortect. If identified as malicious, these tools can remove the malware. If the uninstall.exe file is not harmful and needs to be removed, use its uninstaller located at C:\Program Files\ConstructionSkills\uninstall.exe or the Add/Remove Program function in the Windows Control Panel.
-
1. In the Start menu (for Windows 8, right-click the screen's bottom-left corner), click Control Panel, and then under Programs:
o Windows Vista/7/8.1/10: Click Uninstall a Program.
o Windows XP: Click Add or Remove Programs.
- 2. When you find the program Risk Assessment & Method Statement Manager, click it, and then:
o Windows Vista/7/8.1/10: Click Uninstall.
o Windows XP: Click the Remove or Change/Remove tab (to the right of the program).
- 3. Follow the prompts to remove Risk Assessment & Method Statement Manager.
Common uninstall.exe error messages
The most common uninstall.exe errors that can appear are:
• "uninstall.exe Application Error."
• "uninstall.exe failed."
• "uninstall.exe has encountered a problem and needs to close. We are sorry for the inconvenience."
• "uninstall.exe is not a valid Win32 application."
• "uninstall.exe is not running."
• "uninstall.exe not found."
• "Cannot find uninstall.exe."
• "Error starting program: uninstall.exe."
• "Faulting Application Path: uninstall.exe."
These .exe error messages can occur during the installation of a program, during the execution of it's associate software program, Risk Assessment & Method Statement Manager, during the startup or shutdown of Windows, or even during the installation of the Windows operating system. Keeping a record of when and where your uninstall.exe error occurs is important information when it comes to troubleshooting.
How to fix uninstall.exe
To avoid further issues with Risk Assessment & Method Statement Manager:
- Regularly perform malware scans.
- Clean your hard disk with system tools like Disk Cleanup (cleanmgr) and System File Checker (sfc /scannow).
- Uninstall unnecessary programs.
- Manage startup programs through Task Manager.
- Enable automatic system updates.
- Regularly back up your data or set restore points.
For major issues, use Task Manager and Resource Monitor to diagnose problems. Repair the system using built-in recovery options or the DISM tool, avoiding a full OS reinstallation. Use security software to check for and remove any potential malware.
Updated May 2024:
We recommend you try out this new software that fixes computer errors, protects them from malware and optimizes your PC for performance. This new tool fixes a wide range of computer errors, protects against things like file loss, malware and hardware failures.
- Step 1 : Download PC Repair & Optimizer Tool (Win 11, Win 10, 8, 8.1, 7, Vista – Microsoft Gold Certified).
- Step 2 : Click “Start Scan” to find Windows registry issues that could be causing PC problems.
- Step 3 : Click “Repair All” to fix all issues.
Download or reinstall uninstall.exe
It is not recommended to download replacement exe files from any download sites, as these may themselves contain viruses etc. If you need to download or reinstall uninstall.exe, then we recommend that you reinstall the main application associated with it Risk Assessment & Method Statement Manager.
Operating system information
uninstall.exe errors can occur in any of the following Microsoft Windows operating systems:
- Windows 11
- Windows 10
- Windows 8.1
- Windows 7
- Windows Vista
RECOMMENDED: Click here to troubleshoot Windows errors and optimize system performance